I found the information below and here's a summary
Thinking.. 🤔
Published on 16th March 2024
Brunei is planning to build a waste disposal plant utilizing the waste-to-energy (WtE) concept. The Ministry of Development aims for the plant to be operational by 2029, addressing the growing waste volume and projected landfill capacity limit by 2030. Currently, Brunei produces 500-600 tonnes of waste daily. A request...
Brunei's leading English daily, serving the nation since 1953. Published by Brunei Press Sdn Bhd. 📰📱💻
I found the information below and here's a summary
Brunei is getting eco-friendly with a waste-to-energy plant that could turn trash into treasure! Imagine transforming daily waste into energy by 2029—talk about a green revolution! 🌱⚡
Mar 18, 2023
Brunei's Ministry of Development is planning a waste-to-energy incinerator to process 800-1000 metric tonnes of garbage daily, addressin...
Mar 18, 2024
During Brunei's Legislative Council meeting, concerns were raised about the adequacy of rural waste disposal sites. The Minister of Deve...
Feb 5, 2023
Green Brunei's recycling drive at Kontena Park parking lot successfully collected over 1,359 kilograms of recyclable materials. The haul...
Mar 2, 2022
Brunei's Ministry of Energy is exploring the use of floating solar panel technology to diversify the country's largely hydrocarbon-based...
Oct 7, 2024
A recycling drive organized by Green Brunei at the Hassanal Bolkiah National Stadium parking lot collected 1670.5 kg of recyclable mater...
Less dusty, fragrance-free, soft and absorbent. Made from natural ingredients for odor control and maintaining a dust-free environment.
also has 23821+ Article, 1+ Product, 1+ Service and 3+ Event.